Skip to content

Residential

Walk-in wardrobes

Walk-in wardrobes planned around circulation and daily routine, with open hanging, drawer banks and lighting drawn in from the start.

Walk-in wardrobe in pale oak with open hanging, drawer banks and a mirrored end panel

A walk-in wardrobe is a room before it is a piece of furniture. The first decision is circulation: how much clear space is needed between runs so drawers open fully and hanging can be reached without turning sideways. We set that out on the survey drawing before a single carcass is drawn, using the true dimensions of the room rather than a nominal plan.

Storage is then planned around what is actually kept. Long and short hanging, double-hanging where the ceiling allows, deep drawers for knitwear, shallow lined trays for watches and jewellery, shoe shelving on a rake, and hanging space left deliberately empty for the season in use. Lighting is built into the joinery so shelves are lit rather than the floor.

Finishes usually stay quiet: oak or walnut veneer, hand-sprayed lacquer, fabric-backed panels, bronze or brushed-steel rails, with mirrored end panels used to widen a narrow plan. Where the walk-in adjoins a bedroom, we carry the same timber and detail through so the two rooms read as one scheme.

What the work includes

Circulation setting out
Run positions drawn so drawers and doors clear each other in use.
Open hanging & rails
Long, short and double hanging in bronze, brass or brushed steel.
Drawer banks & trays
Deep drawers, lined jewellery trays and pull-out accessory storage.
Shoe & bag storage
Raked shoe shelving and adjustable shelf runs for bags and boxes.
Integrated lighting
Shelf and rail lighting wired into the joinery, switched or sensor-operated.
Islands & benches
Double-sided drawer islands or benches where the floor area allows.

Suited to

Who this work is for

  • Principal bedroom suites with a spare room to convert
  • Loft and attic rooms with sloping ceilings
  • Apartments where a lobby can become a walk-through wardrobe
  • Designers coordinating a wardrobe with a bathroom or bedroom scheme

How it runs

From brief to installation

  1. 01

    Conversation

    We discuss the brief, the room and the level of finish you have in mind, on site or from drawings.

  2. 02

    Survey & design

    Measured survey, setting out and drawings, with material and finish samples to sign off.

  3. 03

    Workshop

    Cabinetry is made and finished off site, so time on site stays short and controlled.

  4. 04

    Installation

    Careful installation, scribing and final adjustment by the people who made the work.

Plan your walk-in wardrobe

Send the room dimensions and a rough idea of what needs to be stored, and we will suggest a layout.

Call WhatsAppEnquire